Modular Biombo
- TIPO
- Furniture · Modular Interior Partition
- FECHA
- 2024
- CIUDAD
- Madrid
- PAÍS
- Spain
- ESTADO
- Academic Project
The Biombo project is a modular furniture system conceived as an alternative to the traditional folding screen, designed to divide space while hosting multiple functions such as writing, displaying, and spatial filtering. Developed for academic and commercial environments, the system is composed of interlocking planes and frames that assemble without mechanical fixings, enabling flexibility, reconfiguration, and reuse. The design is governed by a rigorous geometric framework based on the golden ratio, which defines proportions and spatial relationships throughout the piece.
Design: SARQAV Studio